Item |
Job Description |
Date Awarded |
Principal |
1) |
Valve Pilot Integrity Study
Sarawak Shell Berhad / Sabah Shell Petroleum Company Limited |
22/11/2005 |

|
2) |
Supply of Type-C Spring Support
UEC Engineering Sdn. Bhd |
20/09/2006 |

|
3) |
Supply of Maineport’s Acoustic Pipe Support
Dayang Enterprise Sdn Bhd |
17/08/2006 |

|
4) |
Supply of Clock Spring Contact Point Composite Sleeve
Sarawak Shell Berhad |
11/03/2008 |

|
5) |
Supply & delivery of standard pipe support cold insulated (cold shoe)
Malaysia LNG DUA Sdn Bhd |
05/03/2008 |

|
6) |
Provision of Non Intrusive Predictive Inspection Service Using Acoustic and Thermograph Methodologies
Sarawak Shell Berhad / Sabah Shell Petroleum Company Limited |
28/02/2008 |

|
7) |
Provision of Spares and Support Services For Vibration Early Warning System (VEWS) For Central Luconia
Sarawak Shell Berhad / Sabah Shell Petroleum Company Limited |
20/06/2008 |

|